Case Study · Annual Inspection

Zoomlion 33X-42 Truck-Mounted Concrete Boom Pump

Challenge Concrete Pumping needed independent proof that its 33 m boom pump was safe, compliant and ready for another year on site. Cossack Inspections carried out a full annual inspection to AS 1418 and AS 2550 and issued certification.

Annual InspectionPort Kennedy, WA4 March 2026
Download Full Report (PDF) Book an Inspection
Zoomlion 33X-42 concrete pump
150+Checkpoints inspected
8Systems covered
4,220 hrUpper hours recorded
12 moCertificate validity
Machine Snapshot

Plant Details

OwnerChallenge Concrete Pumping
Make & ModelZoomlion 33X-42
Year of Build2020
Serial NumberK16225A0 20H0001
Plant Reg.WB479
Road Reg.1HMT 916
Output (MRC)110 m³ / hour
Axles4
Upper Hours4,220 hr
Odometer156,139 km
The Challenge

Keeping a Working Pump Compliant

Concrete pumps work hard: high-pressure hydraulics, a multi-section boom, outriggers on uneven ground and delivery pipes under constant wear. Under WHS Regulation 2022 the owner needs documented, periodic inspection by a competent person.

The pump also needed its log book, manuals, VSB6 modification plate and previous inspection records confirmed before the new certificate could be issued.

Scope of Work

  • Documents: operator manual, log book, previous boom inspection
  • Boom sections, lugs, pins, sheaves and hazard decals
  • Slew system, slew bolts, bearing and pinion
  • Outriggers and stabilizer controls
  • Hydraulic rams, luff cylinders, hoses and oil cooler
  • Air, electrical, chassis and drive systems
  • Delivery pipes, clamps, safety clips and emergency stops
What Was Inspected

Eight Systems, One Checklist

Boom & Attachments

Base and extension sections, boom lift cylinders, lock valves, sheaves, rope systems, angle indicator.

PASSED

Revolving Frame

Frame, mounting lugs and pins, counterweight, control levers, remote controls, emergency stop, VSB6 plate.

PASSED

Slew System

Slew cylinder, brake, gear, pinion, bearing, bolts, backlash and smooth operation.

PASSED

Hydraulic System

Reservoir, pumps, relief and flow control valves, filters, hoses, oil cooler, steering cylinder.

PASSED

Air Systems

Compressor, reservoirs, brake chambers and valves, drain valves, air lines and gauges.

PASSED

Electrical System

Battery box, cables and isolator, all lights, beacon, horn, back-up alarm, switches and relays.

PASSED

Chassis

Frame, suspension, axles, brakes, parking and emergency release, wheels and tyres, fire extinguisher.

PASSED

Drive Systems

Engine mounts, cooling, fuel system, belts, transmission, PTO pump drives, muffler and spark arrestor.

PASSED
Photo Evidence

Inspection Gallery

Photos captured on site during the inspection. Click any image to enlarge.

All boom sections
All Boom Sections
Front left outrigger
Front Left Outrigger
Rear left outrigger
Rear Left Outrigger
Luff cylinder
Luff Cylinder
Hydraulic rams
Hydraulic Rams
Hydraulic oil cooler
Hydraulic Oil Cooler
Slew drive and bolts
Slew Drive & Bolts
Delivery pipes and clamps
Delivery Pipes & Clamps
Operator panel
Operator Panel
Air system
Air System
Upper hours display
Upper Hours: 4,220 hr
Green inspection sticker
Green Inspection Sticker
Certification

Certificate of Annual Inspection

On completion the competent person signed a Certificate of Annual Inspection. A green inspection sticker showing the inspection date and next due date was fixed to the plant.

The inspection was performed in accordance with AS 1418.1, AS 1418.15, AS 2550.1, AS 2550.15, WHS Regulation 2022 and the manufacturer's specification.

Green annual inspection sticker
CERTIFICATE OF ANNUAL INSPECTION
Certificate No.
COSS CC A 262-3/26 CP
Inspection Date
4 March 2026
Next Due
4 March 2027
Location
Port Kennedy, WA
Plant
Truck Mounted Concrete Boom Pump
Competent Person
Dibyendu Das, MEng (Mech), MIEAust
Supervisor
Ken Hodges
Inspection Body
Cossack Inspections (NATA / Engineers Australia)
Outcome

Certified and Back on Site

01

Fit for Use

Machine considered suitable for use at the time of inspection.

02

Records Verified

Log book, manuals, VSB6 plate and prior inspection details confirmed.

03

Visible Compliance

Green sticker on the plant shows the date and next due date.

04

12-Month Cover

Next annual inspection due March 2027.

Need Your Concrete Pump Inspected?

Talk to our competent persons about annual and major inspections for pumps, cranes and access equipment.

Call 0408 820 351 Email Us

Contact Us Today!

Safety and Quality Accreditation